Skip to content
All showcases
SemiconductorsAdvanced9:00v1.0

Semiconductor Fab Yield and Cycle Time

Which process-control and dispatch policy improves yield without increasing fab cycle time or bottleneck instability?

CausalDigital twinsDESSystem dynamicsMonte CarloOptimization Reviewed · validated 2026-11-18
Storyboard frame for Semiconductor Fab Yield and Cycle Time
0:00 / 9:00

Keyboard: Space play/pause · arrows seek 5s · C captions

Separate causal process effects from product-mix confounding, simulate lots on reentrant routes, and choose dispatch, maintenance and WIP rules on the yield and cycle-time frontier.

Business context
A 300 mm fab runs reentrant routes of about 600 steps on shared tools. Lots on premium products get the best tools, which confounds tool effects on yield with product mix.
Intervention
Route a share of lots by yield priority, change preventive maintenance frequency, and cap work in process.
Outcome
Line yield, cycle time, weekly throughput and bottleneck utilization across 800 simulated quarters.